Our Projects

Gordie Howe International Bridge

On the Gordie Howe International Bridge, Canada’s largest active infrastructure P3, one of our principal’s is trusted with the program’s cost baseline, master schedule, and change control, and negotiates contractor changes on the owner’s behalf.

Rize Parklands

Foundation Value Engineering — 21-Storey Building
Independent review of foundation concrete and reinforcement at the client’s request.
The client was not satisfied that the foundation design for a 21-storey building represented good value, and engaged us to review the concrete and reinforcement quantities. The original foundation had been designed to BS 8110; we verified it independently against CSA A23.3, with loads to the NBCC and capacity design principles applied. This confirmed the foundation was over-designed for the actual loads. We re-analysed it and reduced the concrete volume and reinforcement quantities while maintaining full code compliance and the required factors of safety.

has been added to the cart. View Cart