Experience

Built work that informs everything we do.

Selected project experience that shapes our approach to envelope detailing, construction sequencing, and owner-side coordination.

Case study

Meadowbrook — Passive House at scale.

Project
Meadowbrook
Location
3100 Meadowbrook Lane, Windsor, ON
Scale
10 storeys · 145 units
Distinction
Ontario's largest Passive House multi-residential building
Airtightness
0.128 ACH
Owner
Windsor Essex Community Housing Corp.
Architect
Kearns Mancini Architects
Structural EOR
RJC Engineers
Asridge role
Owner-side project coordination

Meadowbrook is a 10-storey, 145-unit Passive House residence in Windsor, built by Windsor Essex Community Housing Corporation under CCDC 5B Construction Management. It is Ontario's largest Passive House multi-residential building and the first multi-unit public housing built in Windsor in 30 years.

Final airtightness came in at 0.128 ACH — nearly 5× tighter than the threshold required by Passive House International.

That number doesn't get hit on theory alone. It comes from working out envelope detailing on a real site, sequencing trades on real schedules, and resolving on-site value engineering when factory-built wall components had to be swapped for site installation mid-project.

Asridge brings that construction-floor experience to every Passive House and high-performance engagement — modeling, envelope review, and monitoring on site so the built result meets the performance the design promised.

Coverage: Passive House Canada · SABMag · Daily Commercial News.

Cable-stayed bridge infrastructure — Gordie Howe International Bridge experience

Project controls at the $5.7B Gordie Howe International Bridge.

One of North America's largest active P3 programmes — Windsor–Detroit crossing

Broader experience

Across scale and sector.

The firm's leadership has worked across the full spectrum of construction — from United Nations infrastructure in East Africa to project controls on the $5.7B Gordie Howe International Bridge, one of North America's largest active P3 programmes connecting Windsor and Detroit.

That range — from site-level problem-solving on a Passive House envelope to programme controls on a major P3 — informs how Asridge estimates scope, sequences work, and protects schedule and budget on every project we manage, regardless of size.

01 Meadowbrook Passive HouseOwner-side coordination · 10 storeys · 145 units · Windsor, ON · 0.128 ACH airtightness
02 Gordie Howe International BridgeProject controls · $5.7B P3 programme · Windsor–Detroit crossing · North America's largest active P3
03 UN infrastructure, East AfricaInternational infrastructure project delivery · Multi-disciplinary site coordination

More project case studies will be added as Asridge client engagements complete.

Concrete construction work — residential and commercial foundations

Concrete, foundations, and structural work — where the drawings meet the ground.

Residential · Commercial · Municipal housing · Infrastructure